Sunday, January 9, 2011

Golf Ball & Reflexology

Awesome simple method!

I've been watching my dad doing massage to others and made believe that this traditional method actually cures illness and sickness. Even today he is not doing it to others, he still at least do it to himself, especially to his foot area. He uses a small blunt piece of 1/2" x 1/2" wood stick, apply some rubbing oil, and start rubbing his feet, according to his knowledge in reflexology.

Today, he had invented ( I think so)  simple method which simplify the whole tiring process of foot reflexology massage. The simple requirement including a golf ball, some piece of cloth and a piece of foot reflexology knowledge.

Golf Ball
 First, you need to be seated where you can reach your feet on the floor.

Then, put that piece of cloth on the floor where your feet rests.

After that, put that golf ball on that piece of cloth. The whole idea of putting the cloth is to make sure that the ball would not slip away during the rubbing process.

Finally, step on the ball and roll it. Apply it with some pressure, but please refer to the reflexology diagram so you know what you are doing.

Areas of the foot
Anyone can do it! Live healthier today.

Saturday, January 1, 2011

Happy New Year 2011!

WE NEED POWER PLANT!

That is Sabahan new resolution for 2011. Last night new year eve celebration was corrupted with some stupid electrical failure around Tuaran district. It was definitely same as an impotent guy tries to get his man-piece fully functioning, half dead.  It was clear that the raising need of electrical during celebrations like this will cause power imbalance, especially to feed the extra merry bulbs in streets, houses, clubs and entertainment centres.

Well I don't want to create another debate about 'no to coal power plant in Sabah'. What done is done.

But I love to share that, wind farming in Kudat area is progressing very good. I ask a question in Yahoo Answers about Kudat feasibility to become a wind farm area, and some good guy answered and provided a link to a site.

http://www.ongreen.com/deal-marketplace/100mw-wind-farm-kudat-malaysia

Let's pray that this project goes very well in the future.

Sabah Go Green!

Tuesday, December 28, 2010

Tank Storage Erection: Summary Part 1.

The project took place in Pulau Indah for chemical plant expansion. The duration for the completion is around one year, starting with the piling and closed with a final inspection from BOMBA and the client. I only focused most on mechanical works above than other works.

So here it is.

Sorry I have to skip the civil works for tank foundation, since I don't have the pictures; it is all kept in the memory card which I sent to the main office. I told them to post it, but they didn't.

The civil works for tank foundation was mostly piling, and then followed with reinforcement bar, and finally the concreting. So, from here, let's move to the first picture.


Laying Bitumen to the tank foundation


Laying Bitumen to the tank foundation


Laying Bottom Plate


Shell Manhole opening


Shell Manhole opening


Pipe rack footing construction


Pipe rack footing construction - concreting


Shell plate installation in progress


Far view of works on site


Installation of pre-fabricated pipe support


Tank roof truss stacked together


Laying off 4" piping to the pipe support


General progress


Construction of pump shed footing


Pre-fabricated shell manhole


Construction of pump shed in progress


General works in progress


Hacking pavement for future underground electrical cable installation


Hacking pavement for installation of underground electrical cables.


Existing piping and cables underground


Bad weather should be recorded because it is intefering the work progress.


Pipe supports installed



Reinforcement plate ready for the shell manhole.
 

Site General View


Shell plate welding in progress for vertical and horizontal seams.


Tank storage


Concreting work in progress


Pump Shed floor slab concreting in progress.


Installation of roof truss in progress.


Excavation works for pipe footing installatin between tanks.


Installation of roof truss in progress.


Pre-fabrication of intertank walkway.


More progress for pump shed footing and plinth.


General view of the roof truss


General view of the roof truss.


Installation on spiral stairs.


Installation of gate valves at tank nozzles.


Installation of gate valves for tank nozzles.


General View.


General view of piping at the exchange hose area.


Installed spiral stairs.


Different view at the exchange hose area.