Tank Storage Erection: Summary Part 2 (Final).

This is the sequel to Tank Storage Erection: Summary Part 1. This post shows mostly the painting jobs. This is the final review, so I included a short video for the testing of Firewater Pipe Line. And I'm done with it. I did not join the commissioning, but I am lucky enough to join the team from the kickoff through the part final. Great experience.
Here it goes.


Roof plate installation.

Preparation to install roof manhole.

General View for manhole cover.

Roof plate installation in progress.

General View for tank roof.

Roof manhole installed.

General View of tank roof plate.

Touch Up and Painting.

Tank Handrail installed.

Tank Handrail installed.

Touch Up for seam welding.

Second Coat.

Erecting Scaffolding for painting works.

Scaffolding.

Partial paint job done.

Painting job in progress.

me in red.

Tank Numbering.

Far View.

Tank Handrail painting in progress.

Tank Handrail painting in progress.




Sunday, January 16, 2011

God or Demon?

        Last time, Sabah was hit with the appearance of images in Keningau. It was quite significant to the Christian community because the images was related to their beliefs, and frankly change peoples life.

The latest appearance occurred somewhere in Tamparuli district. The image appeared at a dead tarap tree bark near a house, which is located just five meter away. On one night, a boy who happens to be the house member, went downstairs to visit the bathroom. On the way, he saw the dead tree glowing in the dark, thus showing the image. He went upstairs and told his mother. They both came down and confirmed that the image was so much like Jesus. So, the boy stayed there, sitting in his own  pool of tears.

Following are the images people would see if they come to see the latest appearance in Tamparuli.



The image of Jesus, captured few days after it was discovered.


Captured near the top left of the image. It was not a 3D image.


Captured from right side of the image


Captured from in front.

The image was not a 3D image but a whole illusion made out of colour tones. If you love portrait drawing, you'll see that the artist are using colour tones to make a 3D faces on their masterpiece. It is a brilliant technique.

Now, the question is, which brilliant 'supernatural artist' did this?

God or Demon?

Maybe it is a sign. Or maybe it is just illusion. Don't just believe on anything you can see, but believe things that are unseen too.

Monday, January 10, 2011

Bayi Bongkok

Cara biasa dulu-dulu
Malang buat orang-orang yang badan mereka tidak tegak akibat kesilapan ibubapa mereka dahulu. Jadi, buat ibubapa yang masih mempunyai anak-anak  kecil dan mengamalkan pengunaan buaian seperti dalam gambar, anda perlu berhati-hati mulai sekarang.

Bongkok adalah perkara yang kita tidak jangka dan pasti tidak disukai jika memilikinya. Mungkin ada banyak perkara yang menyebabkan bongkok ini terjadi, misalnya kekurangan susu untuk pembentukan tulang dan sebagainya.

Namun, inilah peringatan yang harus diberikan kepada ibubapa yang mengamalkan buaian kepada bayi mereka.

 PASTIKAN BADAN ANAK ANDA DALAM POSTUR YANG BETUL SEMASA TIDUR.

Mungkin ramai orang tidak tahu, bahawa tumbesaran manusia biasanya sangat aktif ketika manusia sedang tidur. Bayangkan bayi-bayi anda dalam keadaan bongkok ketika tidur dalam buaian, maka pembesaran tulang mereka juga pasti akan mengikut bentuk itu, sehinggalah pada suatu peringkat, tulang sudah benar-benar tidak dapat dibentuk lagi.

Beringatlah wahai ibubapa, tulang anak anda juga tanggungjawab anda.

Sunday, January 9, 2011

Golf Ball & Reflexology

Awesome simple method!

I've been watching my dad doing massage to others and made believe that this traditional method actually cures illness and sickness. Even today he is not doing it to others, he still at least do it to himself, especially to his foot area. He uses a small blunt piece of 1/2" x 1/2" wood stick, apply some rubbing oil, and start rubbing his feet, according to his knowledge in reflexology.

Today, he had invented ( I think so)  simple method which simplify the whole tiring process of foot reflexology massage. The simple requirement including a golf ball, some piece of cloth and a piece of foot reflexology knowledge.

Golf Ball
 First, you need to be seated where you can reach your feet on the floor.

Then, put that piece of cloth on the floor where your feet rests.

After that, put that golf ball on that piece of cloth. The whole idea of putting the cloth is to make sure that the ball would not slip away during the rubbing process.

Finally, step on the ball and roll it. Apply it with some pressure, but please refer to the reflexology diagram so you know what you are doing.

Areas of the foot
Anyone can do it! Live healthier today.

Tuesday, December 28, 2010

Tank Storage Erection: Summary Part 1.

The project took place in Pulau Indah for chemical plant expansion. The duration for the completion is around one year, starting with the piling and closed with a final inspection from BOMBA and the client. I only focused most on mechanical works above than other works.

So here it is.

Sorry I have to skip the civil works for tank foundation, since I don't have the pictures; it is all kept in the memory card which I sent to the main office. I told them to post it, but they didn't.

The civil works for tank foundation was mostly piling, and then followed with reinforcement bar, and finally the concreting. So, from here, let's move to the first picture.


Laying Bitumen to the tank foundation


Laying Bitumen to the tank foundation


Laying Bottom Plate


Shell Manhole opening


Shell Manhole opening


Pipe rack footing construction


Pipe rack footing construction - concreting


Shell plate installation in progress


Far view of works on site


Installation of pre-fabricated pipe support


Tank roof truss stacked together


Laying off 4" piping to the pipe support


General progress


Construction of pump shed footing


Pre-fabricated shell manhole


Construction of pump shed in progress


General works in progress


Hacking pavement for future underground electrical cable installation


Hacking pavement for installation of underground electrical cables.


Existing piping and cables underground


Bad weather should be recorded because it is intefering the work progress.


Pipe supports installed



Reinforcement plate ready for the shell manhole.
 

Site General View


Shell plate welding in progress for vertical and horizontal seams.


Tank storage


Concreting work in progress


Pump Shed floor slab concreting in progress.


Installation of roof truss in progress.


Excavation works for pipe footing installatin between tanks.


Installation of roof truss in progress.


Pre-fabrication of intertank walkway.


More progress for pump shed footing and plinth.


General view of the roof truss


General view of the roof truss.


Installation on spiral stairs.


Installation of gate valves at tank nozzles.


Installation of gate valves for tank nozzles.


General View.


General view of piping at the exchange hose area.


Installed spiral stairs.


Different view at the exchange hose area.